If you want to use a Dutch pig housing layout in Germany, there are five areas to review: flooring and lighting, the scope of supply, the transition route for existing sow facilities, group layout and the number of animals per pen. For group housing of pregnant sows, the biggest adjustment is often in the breeding area, where German rules set different space requirements for the period between weaning and insemination than those used in the Netherlands. Before submitting a German building application, also finalise the flooring and lighting for the weaned piglet section, so the construction drawings, planned stocking density and quotation all work from the same dimensions.
1. Which flooring and lighting specifications can you retain for German piglet pens?
A concrete slatted floor that is suitable for a Dutch weaned piglet section does not automatically need to be replaced in Germany. The dimensional limits are the same for the same animal category and flooring type. Lighting is a different matter, as an identical design may fall short. Review the legal requirements for each element, then distinguish them from any additional standards agreed by the project team.
| Element in an indoor housing area for weaned piglets | Netherlands | Germany | Label, buyer requirement or project agreement |
|---|---|---|---|
| Concrete slatted floor | Under the Dutch government’s Besluit houders van dieren (2014): openings no wider than 14 mm and slats at least 50 mm wide. | Under § 22 of the German government’s TierSchNutztV (2006): openings no wider than 14 mm and load bearing surfaces at least 50 mm wide. On concrete floors, edges must be free from burrs. | A specified slat pattern, a larger solid floor area or a particular material may also be required under buyer specifications or project agreements. |
| Lighting | Under the Dutch government’s Besluit houders van dieren (2014): at least 40 lux for a minimum of 8 hours a day. | Under § 26 of the German government’s TierSchNutztV (2006): where insufficient daylight means artificial light is also required during the day, at least 80 lux must be provided in the animal area for a minimum of 8 hours a day. In clearly defined lying areas, this may be reduced to 40 lux under that provision. | Agreed measurement points and the handover test are project requirements. Check German rules for daylight openings separately, as a lighting plan does not replace that assessment. |

In practice, the adjustment is therefore more likely to involve the placement of light fittings than the dimensions of the concrete slatted floor. Have the lighting calculation prepared using the actual pen layout. A calculation for an empty room does not account for shadows cast by solid pen partitions. The floor drawing should also show where a slatted module meets a solid floor. This is exactly where the installed result can differ from the panel dimensions stated on paper.
2. What should be included in the supply package for a German piglet section?
A quotation for piglet pens may cover the pen walls and doors, while the slatted flooring, feeders and drinkers are budgeted elsewhere. Compare the components for each section, not just the price per pen. If the supplier is designing both the floor and the pen equipment, clearly define where responsibility for the connection to the building passes to the contractor or installer.
- Pen equipment and section drawing: Have the piglet pens, partitions and walkways designed around the available building dimensions. Specify which components will be made in steel, stainless steel or plastic.
- Slatted flooring, feed and water: Request a specification of slatted modules, feeding systems and drinkers for each section. Show their positions on the same drawing, so you do not discover during installation that a feeder sits within a door’s swing path.
- Supply and installation: State in the quotation which components will be manufactured, delivered and installed, and which tasks fall outside the scope. Agree with all parties who will check the connection dimensions before production begins.
The investment will depend on factors including the number of pens, material choices, non standard building dimensions and the division between supply and installation. For refurbishment projects, it also matters whether sections will become available in phases. If you are upgrading the farrowing section at the same time, draw the piglet feeder position in the loose farrowing pen separately. The feeder must fit the piglet nest and the sow’s movement area, rather than being based on the layout of a weaner pen.
3. How should you plan the Bauantrag for a sow barn conversion?
For an existing German sow facility, start by reviewing § 45 of the TierSchNutztV. The transitional provision for the breeding area is set out in § 45, paragraph 11a. When the regulation was amended in 2021, the German government linked this route to housing that had already been approved or brought into use before 9 February 2021. For these facilities, the standard transition period ends on 9 February 2029. DLG Mitteilungen explains the practical impact: the group housing period begins immediately after weaning and, in principle, continues until one week before farrowing.

For the standard transition route for the breeding area, § 45, paragraph 11a, of the German government’s regulation (2021 amendment) required an operational and conversion plan to be submitted by 9 February 2024 at the latest. If the conversion requires planning permission, evidence that the building application had been submitted was also required by 9 February 2026. For existing farrowing facilities covered by the separate transitional provision, § 45 of the same regulation sets 9 February 2036 as the final deadline, with 9 February 2033 applying to the conversion plan and, where planning permission is required, proof that the building application has been submitted. A conversion plan does not replace the application itself.
- Review the existing file. You provide the permits and documentation showing when the facility was brought into use to the local adviser. The barn equipment supplier uses the confirmed starting points to establish which layouts are technically feasible.
- Confirm stocking density for each section. You provide the animal groups and required capacity. The barn equipment supplier calculates how much usable space remains once feeding places, partitions and walkways have been drawn in.
- Coordinate the drawings before submission. You ask the local adviser to establish which permits are required. The barn equipment supplier provides the layout and technical information needed by the building designer.
- Approve the final design. You compare the final drawing with the quotation and application documents. The supplier develops the approved equipment layout for production and confirms the agreed scope for supply and installation.
4. When does group housing for pregnant sows require a new barn layout?
This is particularly relevant when a Dutch breeding area is used as the starting point. Since the 2021 amendment, § 30 of the German TierSchNutztV has required at least 5 m² of unrestricted usable floor area per sow for the period from weaning to insemination. Nutztierhaltung.de explains this requirement for the breeding area. The Dutch government’s Besluit houders van dieren (2014) states a minimum of 2,25 m² per gilt after service or sow without piglets in group housing. These provisions do not cover exactly the same production stage. Do not use the Dutch figure as a conversion factor for all pregnant sows in a German facility.
For a new build, you can allocate a dedicated area for the group after weaning before the building width and corridor locations are fixed. In a renovation, the existing structural layout will partly determine whether you can create the required space by combining pens, moving animal groups or reducing stocking density. Also map the route from the farrowing section to the breeding area, as well as the route from weaned piglets to their section. A capacity schedule alone will not show whether both groups need to pass through the same access route on the same day.
A full barn redesign adds little value if you are only replacing worn pen partitions and the approved layout and stocking density remain unchanged. If it has not yet been established which transitional provision applies to an existing section, have the permit file assessed first. A detail drawing or production quotation will not resolve that uncertainty.
5. Which capacity and cost factors should you compare before deciding?
Recalculate the number of animals per pen whenever the usable area per animal changes. According to the German government’s Tierhaltungskennzeichnungsgesetz (2023), the Stall + Platz housing category provides 12,5% more space than the statutory minimum floor area for the relevant finishing pigs. This is a category in the German housing label, not a general statutory space standard for weaned piglets or sows.
- Animal places per section. Suppose a finishing pig pen accommodates exactly 18 animals under the basic standard. With the same usable pen area, divide 18 by 1,125 to arrive at 16 places. In theory, capacity falls by approximately 11,1%, not 12,5%. The actual outcome depends on rounding down at pen level. Calculate capacity for each pen before determining the total for the section.
- Feeding places and stocking density. With fewer animals in each pen, an existing feeder does not automatically become unnecessary. Check the capacity and accessibility of feeding places against the chosen feeding system and the applicable requirements. If you want to maintain the planned section capacity by adding pens, include the feed and drinking systems for those pens in the cost estimate.
- Construction costs and day to day operation. Compare options using the same stocking density and scope of supply. Even requirements identified early can increase the investment. Early review mainly reduces redesign work and delays. When reusing components, a material choice by zone in the piglet barn helps determine which items will suit the new layout.
Frequently asked questions
When should the barn equipment supplier be involved in the Bauantrag?
Involve the barn equipment supplier before the first version of the submission drawing is prepared, as soon as the building dimensions and intended stocking density are known. At that stage, ask the building designer to share levels and service penetrations as well, so connection points do not need to be moved after the application has been submitted.
Which floor specifications should the supplier provide?
A specification sheet for each floor type should state the animal category, material, opening width, load bearing surface width and required bearing support. Ask the supplier to confirm the permitted load and the design of infill sections too, so the contractor can assess whether the existing support structure is suitable.
Does the German transition deadline apply automatically when you take over a barn?
The existing housing and its documentation determine whether the transitional arrangement applies, not simply the date of takeover. Before purchasing, check whether the previous owner submitted the required documents on time and whether the planned changes fall within those documents.
Can you use a Dutch lighting calculation for a German application?
You can reuse the light fitting data, but have the calculation reassessed against German requirements and the actual section layout. Before handover, define the conditions under which measurements will be taken, so daylight does not mask what the installation delivers when natural light is limited.
Can a German finishing pig barn be converted into a piglet section?
Not on the basis of pen area alone. Check whether the change of use requires planning permission, and assess whether water points are accessible for weaned piglets. An existing connection may be in the right location, while the drinker itself is mounted too high for the new animal group.
Do not leave the pen layout until the building application stage
Review German requirements, buyer standards and supply boundaries against the same floor plan. For group housing of pregnant sows, only approve the equipment layout once the number of animal places, movement routes and technical connections all work on that drawing.
Van Osch B.V. designs, manufactures and supplies tailored solutions for sow and piglet sections, working directly with customers and through an international dealer network. Share your floor plan and required stocking density through the tailored barn equipment page to discuss the layout for your German project.
Sources
- het Tierhaltungskennzeichnungsgesetz van de Duitse wetgever (2023) — het Tierhaltungskennzeichnungsgesetz van de Duitse wetgever
- Besluit houders van dieren — Dibevo
- DLG Mitteilungen — Dlg-mitteilungen
- Nutztierhaltung.de — Nutztierhaltung
- Tierschutz-Nutztierhaltungsverordnung (TierSchNutztV), §§ 22, 26, 30 en 45 — Duitse wetgever
- Besamungsstall. Gruppenhaltung geschickt umsetzen — DLG Mitteilungen
- Novellierte Tierschutz-Nutztierhaltungsverordnung — Nutztierhaltung.de
- Tierhaltungskennzeichnungsgesetz — Duitse wetgever